Pipeline Asset Management (2013)

Client

Miller-Coors (CH2M HILL/OMI)

Prime Contact

Kile Snider, PE
Principal Project Manager

Office: 720.286.6024
Mobile: 970.215.6788
[email protected]

BlueWater Personnel / Responsibilities

Mark Wade, PE / Asset Manager

Project involved a detailed inspection of all gravity and pressure process water used at seven large breweries in the US. Pipeline materials ranged in age (from 1880 at the Coors facility in Golden CO) to 1980s vintage assets. Field assessment of process and drain wastewater included hydraulic cleaning and vacuum excavating of waste material, external visual inspection and ultrasonic wall loss measurement, internal HDCCTV, and estimate of remaining useful life. Project database was transferred to the M-C asset management system for long-term replacement and renewal of horizontal assets.

Inspection Technology: HDCCTV, leak detection

Inspection Preparation: CCTV, ultrasonics